At November 13th a ferry service had been installed and a new bridge had been constructed at Cattenom. The armor and artillery began rolling now in earnest. This was the added punch needed to continue the drive. The bridgehead was secure, and the Division, though six of its infantry battalions were operating at only 50 % strength, aimed its next blow toward the objective, contact with the 5th Division.