505th Engineer Light Ponton Company HQ and Light Equipage Platoon were loaded
The other Platoons remained at the Marshalling Area until 25 June when HQ and Light Equipage Platoon were loaded on LST 534 and Second Bridge Platoon was loaded on LST 396.